Port of Liverpool – The two road only options on the table

www.liverpoolecho.co.uk/news/liverpool-news/port-traffic-route-headache-option-12556835

The Liverpool Echo has the story – see link above

This is a matter which I have been blogging about for a long time now and I still feel angry about it.

A classic cart before the horse situation if ever I saw one. The new Liverpool 2 River Berth catering for massive Post Panamax container ships is planned, constructed and completed before any serious thought is given as to how the increased freight is going to get to and from it. You really could not make this up as a planning absurdity but that’s pretty much what has happened.

Liverpool 2's massive new container cranes

Liverpool 2’s massive new container cranes

The A5036 route that links the Port of Liverpool at Seaforth with the motorway network at Switch Island is presently the only/major corridor for freight moving to and from the Port. It’s congested, at busy times the capacity is insufficient to cope with the traffic wanting to use it and there are already big concerns about air pollution from the diesel powered HGV’s that thunder up and down it. What’s more the A5036 is hemmed in by residential areas along significant parts of it.

As I have said before there are two options on the table from Highways England, either increase the capacity of the A5036 or build a new road right down the middle of Rimrose Valley Country Park! As if either option is credible and the plans seem to pit residents who live around the A5036 against residents who live either side of the Rimrose Valley.

And what has Sefton Council been doing? And where’s on earth is Network Rail? Between the two of them the best you can say is hiding behind the sofa!

Why has making new rail connections with the port seemingly been forgotten? Where’s the community leadership from Sefton Council?

This is indeed a dogs breakfast of a mess and the people left to pick up the pieces (and the air pollution) are the residents living in Netherton, Litherland, Crosby and Seaforth.

The present consultation on a road only solution needs to be brought to an end and only reconsidered when every possible rail freight possibility has been put in place.

Leave a Reply

Your email address will not be published. Required fields are marked *