Lydiate – Southport Road trenches finally filled in

A couple of days ago contractors working for Sefton Council turned up and the ‘dropped’ trenches across Southport Road adjacent Astor Court were finally filled in.

The trenches had been caused quite some time ago and probably at differing times as utility contractors had dug up the road surface. Trouble has been that the filled in trenches had dropped down and the noise and vibrations caused by vehicles hitting them was disturbing Southport Road residents.

My previous posting from August 2017 refers as Cllr. Edie Pope had been chasing this matter up:-

tonyrobertson.mycouncillor.org.uk/2017/08/28/lydiate-the-condition-of-southport-road-surface/

Leave a Reply

Your email address will not be published. Required fields are marked *