Maghull/Lydiate/Melling – Simple cycling fixes for Sefton Council to undertake

It’s a given that the UK’s cycling network is well behind many European countries and that we seem to struggle to catch up. Major investment is required and whilst some progress is being made the pace is painfully slow.

But sometimes you know there are fixes that are easily done but which get overlooked. Here’s the obvious ones for me around Maghull, Lydiate & Melling:-

* Junction of Moorhey Road & Northway, Maghull – a dropped kerb for access to the cycle path along Northway towards Switch Island.

Just a dropped kerb and a bit of tarmac required at junction of Moorhey Rd and the Northway Service Road.

* Robins Island, Lydiate – add a small length of cycle path from Liverpool Road around the corner to the long established cycle path northwards along the A59.

Around the corner just out of shot is the present start of the cycle track. Start it in Liverpool Road where there’s presently just a narrow pavement.

* School Lane, Maghull – a dropped kerb is needed to access the new cycle path to Park Lane along side the new Maghull North Station.

A simple dropped kerb is all that is needed here on School Lane.

* Park Lane, Maghull – exiting the new cycle path from the station direction and turning right into Park Lane can be dangerous as cyclists vision is obscured by the railway over-bridge and the curvature of Park Lane. Whilst the speed limit is only 20mph on Park Lane in reality speeds can be well over 40mph. Sleeping policemen required on the approach to the bridge me thinks.

View at Park Ln end of cycle track. Cyclists can’t see speeding vehicles & they can’t see cyclists.

* Junction of Prescot Road and School Lane Melling – the new cycle path/track down to this junction from the Ashworth M58 Motorway junction finishes abruptly just before the junction as the new and still being constructed cycle path to Kirkby switches to the other side of Prescot Road. But what about the cyclists turning the corner into Prescot Road to head north? The present layout actually means that cyclists should join the road just before the junction! All that’s required is a few yards of cycle track around the junction corner.

Cycle path ends and the implication is to go on the road. A few yards of additional cycle track around in to Prescot Road would solve the problem.

What’s more I’m sure that there are many more simple cycling fixes across Sefton Borough, Merseyside and indeed the whole UK that would help tip the balance of cycling safely in favour of those of us on 2 wheels. It’s not always that grand schemes need to be the goal. And that reminds me that a similar problem applies to our railway infrastructure – simple fixes like reconnecting the Burscough Curves have been overlooked for 40 years or more.

The Burscough Curves are in West Lancashire. This historic shot of them is from when they were in place, in 1960’s.

Click on the photos to enlarge them