Maghull/Lydiate/Melling – Simple cycling fixes for Sefton Council to undertake

It’s a given that the UK’s cycling network is well behind many European countries and that we seem to struggle to catch up. Major investment is required and whilst some progress is being made the pace is painfully slow.

But sometimes you know there are fixes that are easily done but which get overlooked. Here’s the obvious ones for me around Maghull, Lydiate & Melling:-

* Junction of Moorhey Road & Northway, Maghull – a dropped kerb for access to the cycle path along Northway towards Switch Island.

Just a dropped kerb and a bit of tarmac required at junction of Moorhey Rd and the Northway Service Road.

* Robins Island, Lydiate – add a small length of cycle path from Liverpool Road around the corner to the long established cycle path northwards along the A59.

Around the corner just out of shot is the present start of the cycle track. Start it in Liverpool Road where there’s presently just a narrow pavement.

* School Lane, Maghull – a dropped kerb is needed to access the new cycle path to Park Lane along side the new Maghull North Station.

A simple dropped kerb is all that is needed here on School Lane.

* Park Lane, Maghull – exiting the new cycle path from the station direction and turning right into Park Lane can be dangerous as cyclists vision is obscured by the railway over-bridge and the curvature of Park Lane. Whilst the speed limit is only 20mph on Park Lane in reality speeds can be well over 40mph. Sleeping policemen required on the approach to the bridge me thinks.

View at Park Ln end of cycle track. Cyclists can’t see speeding vehicles & they can’t see cyclists.

* Junction of Prescot Road and School Lane Melling – the new cycle path/track down to this junction from the Ashworth M58 Motorway junction finishes abruptly just before the junction as the new and still being constructed cycle path to Kirkby switches to the other side of Prescot Road. But what about the cyclists turning the corner into Prescot Road to head north? The present layout actually means that cyclists should join the road just before the junction! All that’s required is a few yards of cycle track around the junction corner.

Cycle path ends and the implication is to go on the road. A few yards of additional cycle track around in to Prescot Road would solve the problem.

What’s more I’m sure that there are many more simple cycling fixes across Sefton Borough, Merseyside and indeed the whole UK that would help tip the balance of cycling safely in favour of those of us on 2 wheels. It’s not always that grand schemes need to be the goal. And that reminds me that a similar problem applies to our railway infrastructure – simple fixes like reconnecting the Burscough Curves have been overlooked for 40 years or more.

The Burscough Curves are in West Lancashire. This historic shot of them is from when they were in place, in 1960’s.

Click on the photos to enlarge them

Maghull – North Station fence and cycle path

Maghull North Station as it was nearing completion in 2018

I’ve blogged about Maghull new 2nd railway station many times, often with a little frustration about the design details which have been left hanging well after the station opened.

Now don’t get me wrong (a Jim Sharpe’ism – Jim is a journalist on our local Champion newspaper) having campaigned for the station to be built I’m happy that it has been, but for the life of me some of the issues with it should not still be issues now, well over a year since it was opened.

The good news is that a significant length of the old decaying wooden fence left over from the former Moss Side Hospital site has now been removed along the site’s School Lane boundary. I think that fellow environmental campaigner Frank Sharp (no relation to Jim) will have had a hand in this via his chivying of Merseytravel etc.

Now about that cycle/footpath which opened recently and connects the new station with both School Lane and Park Lane. It’s very welcome but at the School Lane end there’s still no dropped kerb for cyclists to access it and the new station via the level access. I lose count of the number of times I’ve pointed this out to Sefton Council and Merseytravel. This photo illustrates:-

whilst at the Park Lane end it does have a dropped kerb:-

At neither end does the path have any pedestrian barriers though and I would have thought that barriers erected in a chicane-type arrangement would make things safer in respect of children running out onto the road.

Small things of detail in many ways, and yes I’m sure there are much bigger matters to think about, but never the less you’d think such straight forward and cheap to fix issues would be all a part of the station building and it’s wider access environment planning.

Click on the photos to enlarge them

Maghull – North Station Foot/Cycle path to Park Ln – Nearly but not quite yet

Following a tip off from a local resident to the effect that contractors working on the Poppy Fields housing estate were in the process of opening up the long- awaited foot/cycle path through to Maghull North Station from Park Lane I went to have a look.

This how things were panning out this morning around 8.30am:-

But the path does not yet connect to the Station as it’s still fenced off near to the Station car Park:-

By the way at 8.30am today there were no spaces available in the Station car park as far as I could tell.

The path was actually laid out when the Ashworth South Site was down to be a new prison but it has remained out of use throughout it’s significant lifetime – some 10 years or more I think.

Well it looks like it may be fully opened up in the not too distant future when landscaping around it has been installed. A long wait indeed but a useful access path for pedestrians and cyclists will soon be with us, I hope.

With thanks to Frank Sharpe for the lead to this posting.

Notes:- (1) There is a dropped kerb at the Park Lane end of the path so it’s easy access for cyclists unlike the supposed level access off School Lane where there’s still no dropped kerb for cyclists into the station.

(2) Fencing issues off School Lane are yet to be resolved – seems there a lack of money.

Maghull – It’s new North Station certainly has had it’s fair share of snagging issues

I guess that any new building and construction will have its snagging issues but Maghull’s new North station certainly has had what some folk would suggest is more than its fair share.

* No level access off School Lane for pedestrians, cycles and those with disability until 3 months after the station was opened and still no dropped kerb off School Lane for cyclists.

* A rather strong smell which I’m told is now being attended to.
* Lifts not working to platforms for first couple of weeks after station opening.
* Still a non-functioning public toilet

* No pedestrian/cycle path from Park Lane yet

* Appalling noise from testing of PA system
* Why only one small open shelter on the busy Liverpool bound platform?

Another issue raised by some locals is the old 6ft wooden boarded fence which has mostly been taken away but for part that fronts the station onto School Lane. Yes it presently has artwork on large banners affixed to it that was produced by local school children but obviously those banners will have a limited life. What happens to the old fence then? It will be no positive advert for Merseyrail that’s for sure when the banners are gone.

And of course there’s some head scratching going on about why the bus stops are a fair step or fifty away from the station:-

Don’t get me wrong, I’m delighted that it’s been built as I campaigned for it over many years but I really do wonder about the detail of the project management. And you may wonder why I’ve not mentioned the size of the car park which is clearly a problem too i.e. it seems to be far too small. Well yes it is but that’s really a consequence of the lack of adequate car parking at the 3 stations north of Maghull North, indeed Aughton Park has none at all! Also the pricing structure of tickets can encourage folk to drive to Maghull’s 2 stations to pick up a Liverpool bound train. Trouble is this in turn means that whilst Maghull has a vast car park and Maghull North has a reasonably sized one there’s no room on a normal work day in either for Maghull, Lydiate and Melling resident’s cars unless they get there very early. This unfortunate conundrum, which will inevitably lead to more and more commuter’s cars being parked on the Poppy Fields Estate, needs to be addressed by Merseytravel & Lancashire County Council.

Click on any of the photos to enlarge them.

Maghull – Foot and cycle path to Park Lane from new station

I’ve raised this issue a few times recently as back when the Poppy Fields housing estate site was down to be a new prison there was, along with the new Maghull North Station, an access path to be constructed right through to Park Lane. The path was brought into the the design of the site so to provide easier access to the new station for residents in the Park Lane area.

Here’s part of the access path looking towards Park Lane from Maghull North Station car park. Like Goldcrest Road it was constructed as part of the initial works for the prison that was cancelled.

My concern and indeed that of others has been that whilst the new station has been completed there’s no sign of the path being completed and opened up. This led me to chase up Merseytravel and Sefton Council and I now have what looks like some good news. This statement is from Sefton Council Highways Dept:-

I can confirm that I have persuaded Persimmon Homes to incorporate this footpath within their formal s38 Highways Act 1980 submission for the roads and footpath to be put forward to the Council for formal adoption. They will in turn become highways maintainable at public expense.

My thanks to Sefton Highways for chasing this matter through and gaining a good end result. It will just be a question of time now before the footpath/cycle path is completed and opened up for public use. That timescale is presently unknown and is down, I understand, to the phasing of the house builder’s works on the Poppy Fields site.

Hope that helps? Oh and BTW Sefton Highways have also agreed to take up the issue of the requested dropped kerb (for cyclists) onto School Lane where the recently opened level access to the new station reaches the pavement.

Maghull – It’s new North Railway Station will have level access soon – Only 3 months after it opened!

Well the pressure finally brought about some action and work is proceeding – This is how things looked earlier today:-

But who will provide the dropped kerb to enable cyclists to access the station off School Lane? Oh no, let’s hope it not another case of here we go again; let’s guess the likely responses:-

It was not considered as part of the new station build project
or
It’s Merseytravel’s/Merseyrail’s/Sefton Council’s/Persimmon’s/Network Rail’s responsibility
or
Sefton Council will provide a dropped kerb if someone else pays for it
or
There’s no money and its not going to happen
or
Common sense will prevail and someone in authority will get it done ASAP

Take your pick but don’t hold your breath because I’m beginning to think that too many things about this new station project were not thought about/planned for.

PS. I’m still awaiting some firm information about the proposed foot/cycle path through to the station from Park Lane i.e. is it going to happen and if so when?