Maghull & Lydiate’s ‘Berlin Wall’ & the ‘Bible’ of cycling infrastructure

In response to a previous posting about cycling infrastructure in Sefton Borough a Twitter responder (Clive Durdle) pointed me (and indeed Sefton Council) towards something called CROW. Yes, I wondered what it was too but after some Googling I realised it’s pretty much the ‘Bible’ for building cycle friendly/safe roads. And surprise, surprise (NOT) it’s a Dutch publication.

Here’s a blog posting about it:-

therantyhighwayman.blogspot.com/2019/07/crow-flow.html

And here’s a link to the publishers – by gum it’s not cheap!

crowplatform.com/product/design-manual-for-bicycle-traffic/

The new Alt JUnction

Of course, the obvious question is what manual were Sefton Council using when they designed the new junction in Maghull – A59/Northway-Liverpool Road South-Dover Road (The Alt Junction) – as I struggle to see how cycling through this brand new junction was considered at all! Frankly, I’ve yet to hear a good word about it from the pedestrians, cyclists or drivers whom I’ve spoken to. Yes, I realise it’s new and we generally don’t like change so we’re often sceptical about many new things, but this junction could start to become almost as unpopular as its much bigger brother just a few hundred yards away from it – I refer of course to the now infamous Switch Island ‘Home of traffic Accidents’.

The reason this new junction is important is because there are few crossing places across Maghull & Lydiate’s ‘Berlin Wall’ otherwise known as the A59/Northway dual carriageway (and even fewer safe ones) for pedestrians and cyclists. These are they south to north:-

* South end of Maghull adjacent to River Alt – A good pedestrian/cyclist safe crossing with traffic lights.
* The Alt Junction – Brand new but in my view far from being cyclist friendly & it’s a long walk for pedestrians.
* Hall Ln Junction – Pedestrians have high-level bridge to cross but it’s disability/cyclist unfriendly(steps).
* Damfield Ln Junction – Another high-level safe walking bridge but it’s disability/cyclist unfriendly (steps again).
* Westway/Eastway Junction – A pedestrian subway which cyclists are discouraged/banned from using.**
* Dodds Ln Junc’ – A good pedestrian crossing with traffic lights separate to the non-traffic lighted junction.
* Kenyons Ln Junction – Traffic lighted but no pedestrian phase & lights often do not recognise waiting cyclists.
* Robins Island – Traffic island with no pedestrian crossing facilities or safe access onto cycle paths.

The distance between the most southerly A59 crossing and Robins Island is @2.25 miles the vast majority of which is through two highly populated suburban communities, except the Kenyons Ln – Robins Island section. What’s more a large proportion of community facilities – Town Hall, Leisure Centre, Library, Frank Hornby Museum, Police Station, Health Centre, Industrial Estate, Recycling Centre, Main Shopping Centre and Lydiate Village Centre – are all on the western side of it. Maghull’s 2 railway stations being on the east side together with 2 of the 3 local high schools*. My point being, there are many reasons why Maghull & Lydiate folk have to cross this busy major road each and every day and the crossing facilities for pedestrians and cyclists are far from adequate.

We all know we should be walking and cycling more to help us to be fitter/healthier and of course to save the planet but the way Maghull & Lydiate has been set up/planned in effect encourages vehicle use simply because of the lack of safe/accessible crossing facilities associated with it’s very own ‘Berlin Wall’.

On that basis why has the most recently rebuilt junction on ‘The Wall’ been built with cycling facilities all but excluded? Has Sefton Council got a copy of CROW and if so is it simply gaining dust on a shelf in some out of the way storeroom?

* The local primary schools are split 4 on the east side, 5 on the west

** The pedestrian only subway looks like this:-

It could be adapted for pedestrians and cyclists like this one in York:-

I would be interested to hear what others think about shared space subways in cycling unfriendly Maghull, Sefton Borough or elsewhere.

Maghull – Cycling the A59 – Alt Junction to Switch Island

I mentioned recently my concerns as a cyclist (and those of pedestrians) about how the Alt junction has been reconstructed and here’s a link back to that posting:-

tonyrobertson.mycouncillor.org.uk/2020/05/26/maghull-a59-alt-junction-reconstruction/

Sefton Council had told me that two additional pieces of work were to be undertaken along with the junction ‘improvements’ to improve cycling access. So far with contractors having left site one has only been partially done and the other has not been done at all.

The major cycling work is to extend the cycle path/route which comes from Switch Island so that it reaches the Alt Junction. Clearly some works have been undertaken but a section over the River Alt bridge has been left just as it was, a narrow pavement – see photo below. Why?*

The other item is such a small change one wonders why it had not been sorted out years ago. It’s at the junction of Moorhey Road and the A59/Northway Service Road where a cycle route starts taking cyclists towards Switch Island. However, at the very start of it there’s no dropped kerb, which I’ve complained about before and been told by Sefton Council it would be attended to during the Alt junction ‘improvements’. So far, as you can see, the job remains outstanding:-

And yes, I’ve brought my concerns about both these matters to the attention of Sefton Council’s Highways Dept.

* After I wrote this posting but before publishing it I became aware of the plans to redevelop the former Motor Range site for an ALDI etc. so the curtailed works to the cycle path/track could possibly be associated with the changes required should that proposal gain planning permission? Just a thought.

Maghull – A59 Alt Junction Reconstruction

A couple of locals had mentioned to me that they thought this new junction was, in the eyes of a motorist too messy to navigate and in the eyes of a pedestrian a long walk, so I thought I’d cycle through it to see for myself.

I firstly approached it from Liverpool Road South and stopped to try to work out where a cyclist should be to cross over to Dover Road. I worked it out but had my reservations about it being a safe cycle route. I then attempted it from the Dover Road side trying to get to Liverpool Road South. I gave up thinking it was too dangerous and followed the pedestrian route which, as I’d been told, is indeed a long walk.

What strikes me about this junction is that it has been designed for vehicles but sadly pedestrians and particularly cyclists seem to have been very much an after thought. How on earth in 2020 can you design a new junction without incorporating a safe cycle route through it?

The A59 is already a Berlin-type wall right through Maghull and Lydiate and the addition of this new junction has sadly, in my view, only made this situation worse.

Click on the photo to enlarge it